station solutions

Low carbon integrated base station is used for wireless communication machine room, structural mast integrated towering structure.

Low carbon integrated base station of Heqin communications is the only one of the domestic similar products that has passed the wind tunnel test certification, the only one that can accept the maximum wind pressure, and also the only one in the industry that can provide co-construction and sharing of the overall solution products.

It has the characteristics of rapid integration, reusable and easy carry. The investment cost is 1/3 to 2/3 of the same permanent base station with small resource loss.

Products

Wenchang Tan Niu Country garden project department

Wenchang Tan Niu Country garden project department

Integrated base station - Wenchang Tan Niu Country garden project department
Construction time :April 2012
Site (company name): Wenchang Tan Niu Country garden
Applicable wind pressure: 0.9KPa
Height: 30 m
Floor space: 30㎡
Ledong Huangliu Longmu bay administrative center

Ledong Huangliu Longmu bay administrative center

Integrated base station - Ledong Huangliu Longmu bay administrative center
Construction time: April 2012
Site (company name): Ledong Huangliu Longmu bay administrative center
Applicable wind pressure: 0.9KPa
Height: 30 m
Floor space: 30㎡
Integrated base station - Lanxi Magong beach

Integrated base station - Lanxi Magong beach

Integrated base station - Lanxi Magong beach
Site (company name): Lanxi Magong beach
Applicable wind pressure : 0.45KPa
Height: 35m
Floor space: 35㎡
Integrated base station - 25 m Kaitai road integrated (cluster)

Integrated base station - 25 m Kaitai road integrated (cluster)

Integrated base station - 25 m Kaitai road integrated (cluster)
Construction time: April 2013
Site (company name): Kaitai road
Applicable wind pressure : 0.75KPa
Height:25m
Floor space: 30㎡
Integrated base station (1)

Integrated base station (1)

Applicable air pressure: the design air pressure is determined according to the load specification. General design wind pressure should not be too high, it is suggested that not more than 0.65 KN / ㎡.
Applicable height: 20m-35m
Number of antennas that can be mounted: no more than 9 pairs
Maintenance platform: there is no special maintenance platform. The derrick is fixed on the tower body with two-three layers antenna derricks.
Advantages: Its weight can resist overturning without digging the foundation. Quick and flexible layout, only 2 hours on site; the integrated design of tower, defense and foundation, the floor space is very small; modular and combined structure, easy to move;
Disadvantages: temporary structure, low reliability; the cost is high.
Applicable situations: network optimization, fast coverage area; Local hot spots, dilating and blinding areas; Residential obstruction, difficult site area; Urban renewal, demolition and construction area; The area where the pipeline is densely covered and cannot be excavated; Emergency communication, signal protection area; Municipal planning, temporary coverage area.
Construction period: about 1 day
Form of foundation: slab precast foundation       
Integrated base station (2)

Integrated base station (2)

Applicable air pressure: the design air pressure is determined according to the load specification. General design wind pressure should not be too high, it is suggested that not more than 0.65 KN / ㎡.
Applicable height: 20m-35m
Number of antennas that can be mounted: no more than 9 pairs
Maintenance platform: there is no special maintenance platform. The derrick is fixed on the tower body with two-three layers antenna derricks.
Advantages: Its weight can resist overturning without digging the foundation. Quick and flexible layout, only 2 hours on site; the integrated design of tower, defense and foundation, the floor space is very small; modular and combined structure, easy to move;
Disadvantages: temporary structure, low reliability; the cost is high.
Applicable situations: network optimization, fast coverage area; Local hot spots, dilating and blinding areas; Residential obstruction, difficult site area; Urban renewal, demolition and construction area; The area where the pipeline is densely covered and cannot be excavated; Emergency communication, signal protection area; Municipal planning, temporary coverage area.
Construction period: about 1 day
Form of foundation: slab precast foundation       
Integrated base station (3)

Integrated base station (3)

Applicable air pressure: the design air pressure is determined according to the load specification. General design wind pressure should not be too high, it is suggested that not more than 0.65 KN / ㎡.
Applicable height: 20m-35m
Number of antennas that can be mounted: no more than 9 pairs
Maintenance platform: there is no special maintenance platform. The derrick is fixed on the tower body with two-three layers antenna derricks.
Advantages: Its weight can resist overturning without digging the foundation. Quick and flexible layout, only 2 hours on site; the integrated design of tower, defense and foundation, the floor space is very small; modular and combined structure, easy to move;
Disadvantages: temporary structure, low reliability; the cost is high.
Applicable situations: network optimization, fast coverage area; Local hot spots, dilating and blinding areas; Residential obstruction, difficult site area; Urban renewal, demolition and construction area; The area where the pipeline is densely covered and cannot be excavated; Emergency communication, signal protection area; Municipal planning, temporary coverage area.
Construction period: about 1 day
Form of foundation: slab precast foundation       
Integrated base station (4)

Integrated base station (4)

Applicable air pressure: the design air pressure is determined according to the load specification. General design wind pressure should not be too high, it is suggested that not more than 0.65 KN / ㎡.
Applicable height: 20m-35m
Number of antennas that can be mounted: no more than 9 pairs
Maintenance platform: there is no special maintenance platform. The derrick is fixed on the tower body with two-three layers antenna derricks.
Advantages: Its weight can resist overturning without digging the foundation. Quick and flexible layout, only 2 hours on site; the integrated design of tower, defense and foundation, the floor space is very small; modular and combined structure, easy to move;
Disadvantages: temporary structure, low reliability; the cost is high.
Applicable situations: network optimization, fast coverage area; Local hot spots, dilating and blinding areas; Residential obstruction, difficult site area; Urban renewal, demolition and construction area; The area where the pipeline is densely covered and cannot be excavated; Emergency communication, signal protection area; Municipal planning, temporary coverage area.
Construction period: about 1 day
Form of foundation: slab precast foundation       
Integrated base station (5)

Integrated base station (5)

Applicable air pressure: the design air pressure is determined according to the load specification. General design wind pressure should not be too high, it is suggested that not more than 0.65 KN / ㎡.
Applicable height: 20m-35m
Number of antennas that can be mounted: no more than 9 pairs
Maintenance platform: there is no special maintenance platform. The derrick is fixed on the tower body with two-three layers antenna derricks.
Advantages: Its weight can resist overturning without digging the foundation. Quick and flexible layout, only 2 hours on site; the integrated design of tower, defense and foundation, the floor space is very small; modular and combined structure, easy to move;
Disadvantages: temporary structure, low reliability; the cost is high.
Applicable situations: network optimization, fast coverage area; Local hot spots, dilating and blinding areas; Residential obstruction, difficult site area; Urban renewal, demolition and construction area; The area where the pipeline is densely covered and cannot be excavated; Emergency communication, signal protection area; Municipal planning, temporary coverage area.
Construction period: about 1 day
Form of foundation: slab precast foundation       
To view more

Public focus on micro letter

Headquarters address:No. 168 Liuyuan road, Putuo district, Shanghai Contact number:021-36567371 Email:zjhq@hqtx.net
Production base:no. 298 Anwen road, Jinhua city, Zhejiang province Contact number:0579-82235919

Copyright © 2017 and Heqin communications technology co., Ltd Zhejiang CP, no. 11001579 -1